Section 7 CCR Landfill - AVS


Location Restrictions

  1. Placement Above Uppermost Aquifer 
  2. Wetlands 
  3. Fault Areas 
  4. Seismic Impact Zones 
  5. Unstable Areas

Design Criteria

  1. New Unit Design Certification
  2. New Unit Construction Certification

Operating Criteria

  1. CCR Fugitive Dust Plan
  2. CCR Fugitive Dust Plan Annual Report
    1. 2016 Report
    2. 2017 Report
    3. 2018 Report
    4. 2019 Report
    5. 2020 Report
    6. 2021 Report
    7. 2022 Report
    8. 2023 Report
  3. Initial/Periodic Run-on and Run-off Control System Plans
    1. Initial plan
    2. 5-year update (2021)
  4. QPE Annual Inspection Reports for CCR Landfill
    1. 2015 report
    2. 2016 report
    3. 2017 report
    4. 2018 report
    5. 2019 report
    6. 2020 report
    7. 2021 report
    8. 2022 report
    9. 2023 report
  5. Documentation of Corrective Measures Resulting From QPE Annual Inspection of Landfill or Surface Impoundment

Groundwater Monitoring and Corrective Action

  1. Annual Groundwater Monitoring and Corrective Action Report
    1. 2017 report
    2. 2018 report
    3. 2019 report
    4. 2020 report
    5. 2021 report
    6. 2022 report
    7. 2023 report
  2. Groundwater Monitoring System and Statistical Method Certification
  3. Items 4-10 Only Applicable if Assessment Monitoring is Triggered

Closure and Post-Closure Care

  1. Written Closure Plan
  2. Written Post-Closure Plan
  3. Notification of Completion of Post-Closure Care

Archived items

  1. Unstable areas - Oct. 2018
  2. Written Closure Plan - Oct. 2016
  3. Written Post-Closure Plan - Oct. 2016
  4. Groundwater Monitoring System and Statistical Method Certification - Mar. 2022
  5. Groundwater Monitoring System and Statistical Method Certification - Oct. 2017