More than 750 people attended a series of open houses held across the project area for the proposed Laramie River-to-Belfield 345-kilovolt transmission line. The project includes approximately 400 miles of transmission line across portions of Wyoming, Nebraska, South Dakota, and North Dakota. The project would connect the Laramie River area in Wyoming to the Belfield area in North Dakota. Project plans also include building two new substations in South Dakota.
Southwest Power Pool (SPP), the regional transmission planning organization, identified the project through long-range studies that highlighted ways to enhance grid reliability, strengthen system performance, and improve the flow of electricity across the region. The project is expected to expand access to more affordable power for rural communities while helping create a more dependable and resilient electric grid.
Open houses were held in New England, North Dakota; Bison, New Underwood, and Hot Springs, South Dakota; Chadron, Nebraska; and Torrington, Wyoming, in late October and early November. The open houses gave landowners, local member system representatives, state legislators, city council members, county commissioners, and other community leaders an opportunity to learn about the project, review maps and other project information, and speak directly with project team members. Attendees were encouraged to ask questions, share local knowledge, and provide feedback.
“The strong turnout reflects the significant interest the proposed transmission line has generated throughout the region,” Bobby Nasset, Basin Electric manager of civil transmission line engineering, said. “The feedback we received during these open houses will help us make future project decisions and support ongoing engagement with stakeholders as the project moves forward.”
Landowners unable to attend an open house can provide comments specific to their property by using the interactive map linked on Basin Electric’s Laramie River-to-Belfield project web page. The link includes instructions on how to leave comments.
Please note: no final route has been determined. Any potential routes shown on the map are preliminary and will change as the route study progresses. This link will be available until Dec. 18, 2026.
Basin Electric wants all interested and qualified candidates to apply for employment opportunities. If you are an applicant with a disability who is unable to use our online tools to search and apply for jobs, or who needs other assistance or accommodations, please contact us at 701-223-0441. Please indicate the specifics of the assistance needed or provide your contact information, and a Basin Electric Human Resources representative will contact you. Basin Electric is an Equal Employment Opportunity Employer regarding race, color, religion, sex, sexual orientation, gender identity, national origin, disability, and veterans status.